PROJECTS

Focus on Physical Assets

The OpX Leadership Network provides solutions to help maximize efficiency and lower costs.

Engineering

Hygienic Equipment Design for Low-Moisture Food Manufacturing

View guidelines that provide consensus on specific criteria for the design and construction of hygienic production equipment. 

Published 2014

Capital Projects

Factory Acceptance Tests (FAT)
Published 2022

Total Cost of Ownership (TCO)
Revised 2020

Request for Proposal (RFP)
Published 2018

Maintenance

Asset Reliability Roadmap

Published 2020

Remote Equipment Access

Published 2018

 

 

Platinum: Emerson        Gold:  Mettler    CRB    Schneider Electric       Silver: